<?xml version="1.0" encoding="utf-8"?>
				<!-- generator="e107" -->
				<!-- content type="News > Wave Energy" -->
				<rss  version="2.0">
				<channel>
				<title>Hemp4Fuel.com : News > Wave Energy</title>
				<link>/</link>
				<description>News and Common Sense Solutions</description>

<language>en-gb</language>
				<copyright>Hemp4Fuel.com is copyright 2002-2010 J.R. Irvin and http://www.GnosticMedia.com</copyright>
				<managingEditor>Hemp4Fuel - contact@nospam.com</managingEditor>
				<webMaster>contact@nospam.com</webMaster>
				<pubDate>Tue, 07 Sep 2010 18:28:30 -0700</pubDate>
				<lastBuildDate>Tue, 07 Sep 2010 18:28:30 -0700</lastBuildDate>
				<docs>http://backend.userland.com/rss</docs>
				<generator>e107 (http://e107.org)</generator>
				<ttl>60</ttl>
				<textInput>
				<title>Search</title>
				<description>Search Hemp4Fuel.com</description>
				<name>query</name>
				<link>http://hemp4fuel.com/search.php</link>
				</textInput>
						<item>
						<title>Wave energy regulatory war brews</title>
<link>http://hemp4fuel.com/news.php?item.110.2</link>
<description><![CDATA[Wave energy regulatory war brews<br /><br />By Susan Chambers, Staff Writer<br />Sunday, October 19, 2008 | 1 comment(s)<br />Two federal agencies battle for jurisdiction over ocean projects<br />COOS BAY — There’s a renewed fight brewing over wave energy, but it’s not between the fishing industry and developers.<br /><br />http://www.theworldlink.com/articles/2008/10/19/news/doc48f98e6e3d61c180401084.txt?redirect=y<br /><br />This time, it’s between two federal agencies.<br /><br />The Federal Energy Regulatory Commission has assumed it has jurisdiction over projects within state waters, out to three nautical miles — and that’s generally been accepted as the case. The Minerals Management Service has assumed jurisdiction over alternative energy projects in the outer continental shelf, federal waters, beyond three miles.<br /><br />That changed — maybe — on Thursday.<br /><br />FERC decided to flex its muscles and assert its jurisdiction over hydroelectric projects in federal waters.<br /><br />The decision specifically applied to a couple of projects in California and on the East Coast, but in a broader sense, its decision-making power also would apply to any projects for which developers applied in federal waters in other states.<br /><br />“I am confident today’s decision puts to rest any questions about FERC’s jurisdiction over hydroelectric projects on the OCS,” FERC Chairman Joseph T. Kelliher said in a press release.<br /><br />For example, Ocean Power Technologies, which is planning wave energy projects in Reedsport and near Coos Bay, planned for a project off of Newport as well. That project overlaps the three-mile line and juts into federal waters. OPT applied for a FERC permit in 2006.<br /><br />Consequently, MMS, an agency under the U.S. Department of the Interior more accustomed to dealing with offshore oil and gas, disputed FERC’s authority to issue permits or licenses for hydroelectric projects that may be located in whole or in part on the outer continental shelf.<br /><br />MMS said it has federal regulatory authority for those kinds of projects under the Energy Policy Act of 2005. As a result, it’s spent two years establishing an Alternative Energy and Alternate Use program designed to manage potential wave, tide or current energy activities. It also has been developing a programmatic environmental impact statement to examine the potential environmental consequences of implementing the program.<br /><br />FERC, in Thursday’s notice, claims jurisdiction in federal waters under the Federal Power Act.<br /><br />The agency also said it has proposed a memorandum of understanding with MMS that would clearly delineate the roles of the two agencies. At the same time, FERC spokeswoman Celeste Miller said the memorandum could not be released because it had not been signed.<br /><br />Blossom Robinson, a spokeswoman for Minerals Management, said as of Thursday she had not seen the MOU  or even heard about FERC’s new stance.<br /><br />Local impacts<br /><br />It’s a wave new world out there — and regulatory uncertainty is just a part of it, said Lincoln County Assistant County Counsel Rob Bovett.<br /><br />Bovett’s been involved with wave energy for several years, ever since the county began considering alternative energy possibilities and began working with fishermen, Oregon State University and energy developers.<br /><br />He sees MMS as having jurisdiction over projects outside of three miles but also recognizes there are problems with that — both for developers and fishermen potentially affected by buoy farms.<br /><br />The minerals service is not accustomed to energy regulation, Bovett said. And if MMS continues to have jurisdiction, it will add more confusion and more paperwork for developers and the fishing industry.<br /><br />But perhaps the greatest issue is the three-mile line itself.<br /><br />“If we create this artificial line, it may force some projects nearer to shore or farther offshore,” Bovett said.<br /><br />That could generate problems for more than one sector of the fishing industry.<br /><br />Crabbers, for example, generally use the nearshore sandy areas as their fishing grounds. The trawlers’ realm is deeper water, typically offshore.<br /><br />If FERC’s assertion of regulatory authority holds up — and some fishermen and developers hope it will — it could have unintended consequences.<br /><br />“If FERC was in charge of licensing and permitting outside of three miles, and (wave energy) technology supported it, it would take some of the pressure off some of the soft, sandy bottom that is favored for crabbing,” Oregon Dungeness Crab Commission Executive Director Nick Furman said.<br /><br />On the other hand, it could create more problems for trawlers and he doesn’t want to see one part of the fishing industry pitted against the other.<br /><br />OPT has adopted a wait-and-see attitude.<br /><br />“We don’t have an opinion,” said OPT’s vice president of business development and marketing, Herb Nock.<br /><br />For now, OPT is aggressively pursuing its Reedsport and Coos Bay projects, both of which are sited in state waters. The Newport project is on the back burner.<br /><br /> “Over time, I think we’d like to see this resolved,” Nock said. “In the meantime, we have plenty to do within the three-mile limit.”<br /><br />Bovett said there are some advantages to the energy regulatory commission being in charge, in addition to having a seamless transition between inshore and offshore waters.<br /><br />“I think the industry would rather deal with FERC ... because FERC already is a regulatory entity,” he said.<br /><br />Cumulative effects<br /><br />FERC considers each wave energy project on a case-by-case basis, one project at a time. It doesn’t take into account whether another project is placed within a couple miles of an earlier one or what effect the total number of projects would have on other ocean users.<br /><br />It’s a situation the fishing industry has complained about. Fishermen in Coos Bay could be affected by a project off the northern Oregon Coast if that is where they set their crab gear. Fishermen in all three states could be affected by the sheer numbers of wave energy farms, if established, but FERC does not consider multiple buoy farms as a whole.<br /><br />“There’s no advance siting, no comprehensive siting,” Bovett said. “There’s no cumulative effects analysis.”<br /><br />FERC is a regulatory agency, not a planning agency, he added.<br /><br />A benefit to the Minerals Management Service having regulatory authority outside of three miles is the programmatic environmental impact statement. That process considers cumulative impacts of several projects on users and the environment and creates a general framework under which developers could apply for permits or licenses.<br /><br />Also, the FERC licensing process for hydrokinetic energy — government-speak for wave, current or tidal energy projects — is based on the hydropower energy model for dams on rivers. It doesn’t work for ocean projects, Bovett said.<br /><br />“On one hand, I strongly support FERC having regulatory authority,” he said, “but on the other hand, the government hasn’t given them the right tools.”<br />Tags » wave energy, Susan Chambers<br />Tax credits for wave energy<br /><br /><br />Ocean Power Technologies, the company planning to develop wave energy farms near Reedsport and Coos Bay, said it expects to benefit from the Energy Improvement and Extension Act of 2008, signed by President George W. Bush on Oct. 3.<br /><br /><br />The act will enable owners of wave energy projects to receive federal tax credits” a boon to developers trying to establish wave energy facilities. Developing the technology is cost-intensive, developers say.<br /><br /><br />“This is the first time wave power has received U.S. federal tax credits and it is a significant step forward for the industry and for OPT,” Taylor said in a press release.<br /><br /><br />It expands the definition of qualifying facilities for the production tax credit to include those that generate power from marine renewables, including wave and tidal, the press release said. The tax credit is allowed for electricity produced and sold from marine renewable energy facilities of at least 150 kilowatts after Oct. 3. The credit rate for marine renewables is $0.01 per kilowatt hour. The duration of the credit will be 10 years after the facility is placed into service.<br /><br /><br />OPT could receive up to $15 million in credits over a 10-year period from a 50-megawatt wave energy farm, OPT Chief Executive Officer George W. Taylor said.<br /><br /><br />“We believe this will help utilities and independent power producers enhance the near-term benefits from OPT’s technology as an option to meet the ever-increasing need for renewable power.”<br /><br /><br />Staff Writer Susan Chambers<br /><br />[[b]Submitted by Hemp4Fuel[/b]]]]></description>
<author>Hemp4Fuel&lt;contact@nospam.com&gt;</author>
<pubDate>Sun, 19 Oct 2008 11:38:16 -0700</pubDate>
<guid isPermaLink="true">http://hemp4fuel.com/news.php?item.110.2</guid>
</item>
						<item>
						<title>Wave energy prototype test successful, OSU says</title>
<link>http://hemp4fuel.com/news.php?item.66.2</link>
<description><![CDATA[Wave energy prototype test successful, OSU says<br />Tuesday October 14, 2:18 pm ET<br /><br />Oregon State University researchers say wave energy prototype test successful<br /><br />NEWPORT, Ore. (AP) -- Oregon State University researchers say a test of the newest prototype of a wave energy buoy succeeded.<br /><br />The university has been working with Columbia Power Technologies and the Facilities Engineering Command of the U.S. Navy to test 18 "direct drive" wave energy technologies in a $1 million research program.<br /><br />The five best devices were chosen, and one buoy system has now been tested.<br /><br />University officials say the technology used in the test buoy eliminates the need for hydraulic systems and may be more efficient and durable in the ocean.<br /><br />Professor Annette von Jouanne says one technology may emerge as the dominant system for commercial wave parks, but there is room for other systems adapted to individual power needs on a smaller scale.<br />[[b]Submitted by Hemp4Fuel[/b]]]]></description>
<author>Hemp4Fuel&lt;contact@nospam.com&gt;</author>
<pubDate>Tue, 14 Oct 2008 10:49:14 -0700</pubDate>
<guid isPermaLink="true">http://hemp4fuel.com/news.php?item.66.2</guid>
</item>
						<item>
						<title>IBERDROLA RENOVABLES opens wave energy plant at Santoña (Cantabria)</title>
<link>http://hemp4fuel.com/news.php?item.68.2</link>
<description><![CDATA[09/10/2008: IBERDROLA RENOVABLES opens the wave energy plant at Santoña (Cantabria)<br /><br />-The installation, located four kilometres from the coast at Santoña, has no visual impact and its first phase consists of a 40kW buoy<br /><br />-The opening ceremony was attended by the Environment Secretary of the Cantabria Regional Government, Francisco Martín; the Secretary for Industry and Technological Development, Javier Del Olmo; the Mayor of Santoña, Puerto Gallego and IBERDROLA RENEWABLES Director for Spain, Víctor M. Rodríguez, among other personalities<br /><br />-The installation, the first of its kind to be installed in Europe, should be able to cover the annual electricity consumption of some 2,500 homes<br /><br />IBERDROLA RENOVABLES has opened the first buoy of the pilot wave power plant at Santoña (Cantabria), which became the first of its kind in operation in Europe.<br /><br />The opening ceremony, held today in the Cantabrian town, was attended by the Environment Secretary of the Cantabria Regional Government, Francisco Martín; the Secretary for Industry and Technological Development, Javierl Del Olmo; the Mayor of Santoña, Puerto Gallego the Deputy Director General of the SODERCAN Group, Francisco Royano, and the Director for Renewable Energies of the IDAE, Jaume Margarit, among other personalities.<br /><br />For IBERDROLA RENOVABLES, the Director of the Company in Spain, Víctor M. Rodríguez, and the head of Business Development in Spain and President of IBERDROLA Energías Marinas de Cantabria, Javier García, were in attendance.<br /><br />The joint company that is developing the plant, called IBERDROLA Energías Marinas de Cantabria, S.A., is owned by the Company ( IBERDROLA RENOVABLES) (60%), TOTAL (10%), OPT (10%), the Instituto para la Diversificación y el Ahorro Energético (Institute for Energy Diversification and Saving), IDAE (10%), and the Sociedad para el Desarrollo de Cantabria (Cantabria Regional Development Agency), SODERCAN (10%). The budget of the first phase, which includes the marine electricity infrastructure –which will be subsequently deployed-, has risen to some €3 million.<br /><br />The operation of the plant at Santoña involves a number of buoys that, due to the movement of the waves, produce a vertical movement that, through a hydraulic system, activates a conventional generator, which produces low-voltage electricity. This renewable energy will be extracted through a marine substation, in which the voltage is adapted to that of the grid.<br /><br /><br /><br />Consumption of 2,500 homes<br /><br />The first phase involved the installation of a buoy, supplied by OPT, made up of a float of some seven metres in diameter, a shaft –watertight cylindrical compartment- which contains the energy transformation system (20 metres in length) and a stabilizer of approximately 10 metres. It also has a mooring system consisting of three semi-submerged buoys anchored to the seabed at a depth of some 50 metres.<br /><br />The energy transformation system, called Power Take Off (PTO), is made up of a series of internal modules, through which the wave energy is captured and converted in order to store it and, subsequently, extract it under optimum conditions.<br /><br />Since this is an innovative project, before the installation, IBERDROLA RENOVABLES carried out numerous inspections and operating tests through simulations of the operating conditions that the buoy will have to deal with out at sea, with swells of varying intensity.<br /><br />IBERDROLA RENOVABLES plans to include 10 buoys in the plant, which is located four kilometres from the coast at Santoña. The other nine buoys, which will be launched in a later phase, will have an installed power of 150 kW. When the 10 buoys are operational, the annual electricity output of this installation will be approximately equivalent to the domestic consumption of some 2,500 homes. The installation, which has no visual impact, will prevent the emission into the atmosphere of 2,600 tons of CO2 annually.<br /><br />The project has been the beneficiary of the ‘Programa de Fomento de la Investigación Técnica’ (PROFIT) of the Ministry for Industry, Tourism and Trade, aimed at encouraging companies and other entities to carry out technological research and development activities, according to the objectives established in the ‘Plan Nacional de Investigación Científica, Desarrollo e Innovación Tecnológica (National Plan for Scientific and Technological Research, Development and Innovation) 2004-2007’, in the section dedicated to the ‘Fomento de la Investigación Técnica’ (Promotion of Technical Research).<br /><br />Adding to this pioneering project in Cantabria is the wave power plant that IBERDROLA RENOVABLES is developing, through its subsidiary ScottishPower Renewables, near the Orkney Islands, to the north of Scotland, which will become the largest in the world in terms of installed capacity (3 MW). The Company is also analysing three coastal locations off Scotland and Northern Ireland for developing the largest projects in the world involving ocean currents, with a total power of 60 MW, enough to supply 40,000 homes.<br /><br />IBERDROLA RENOVABLES reached an installed power throughout the world of close to 8,000 MW** at the end of the first half of 2008. The Company, which continues to consolidate its leadership at the forefront of the global wind power sector*, already has 4,383 MW of installed wind power capacity in Spain and 3,224 MW abroad.<br /><br />The Strategic Plan 2008-2012 of IBERDROLA RENOVABLES anticipates the investment of €18,800 million during this five-year period, above all in the United States and Europe. The Company boasts a portfolio of products of 54,000 MW, which guarantees the construction of more than 2,000 MW annually during the coming years. For this, it has also covered its necessity of the supply of wind turbines up to 2012, with 10,000 MW assured.<br /><br /><br /><br />* Source: New Energy Finance (December 2007)<br /><br />** Does not include 606 MW owned by a third party under contract of sale of energy<br />[[b]Submitted by Hemp4Fuel[/b]]]]></description>
<author>Hemp4Fuel&lt;contact@nospam.com&gt;</author>
<pubDate>Fri, 10 Oct 2008 10:56:43 -0700</pubDate>
<guid isPermaLink="true">http://hemp4fuel.com/news.php?item.68.2</guid>
</item>
				</channel>
				</rss>